Quote Originally Posted by Grognaurd View Post
So, let us fix the pump / well problem for poor Datu. He cannot get the right current/voltage to the pump to lift the hydrostatic head up out of the ground. He keeps trying to supply more power to lift the head. Let's turn that around. Shrink the weight of the head.

The weight of the head is a function of the length of the pipe and the pipe diameter. Can he put pipes or sticks inside the pipe to occupy space to reduce the effective diameter of the pipe? They do not have to run the big generator 24/7 to get enough water for the colony, it seems they just have to use it because it is the only thing with enough power. My guess, it is over engineered. Shrink the head Datu...

just a guess...

We have this ( ).... Maybe we can turn it into this (o) and reduce the amount of power required

I have no idea if it will work, I am not an engineer, I am a general manager that lives outside of the box, helping techies redefine their problems with fresh eyes
Quote Originally Posted by 7oddisdead View Post
Exactly right.

also could explore the idea of an aquaduct type system once the water is out of the ground well. A large storage vessel above ground close to the pump would lessen the front strain of pushing water to the colony. From there allow gravity to do the work for you
Now, if we only had a way to get this message to Datu.